Trade Law Daily is a Warren News publication.

Emissions Limits in PCS G Block Mean Throttling D2D Coverage: SpaceX

The FCC's out-of-band emissions (OOBE) limits in the PCS G Block will particularly hurt direct-to-device (D2D) real-time communications, making them unreliable in emergency situations, SpaceX said in a docket 23-135 filing posted Monday. The filing was a response to numerous…

Sign up for a free preview to unlock the rest of this article

Timely, relevant coverage of court proceedings and agency rulings involving tariffs, classification, valuation, origin and antidumping and countervailing duties. Each day, Trade Law Daily subscribers receive a daily headline email, in-depth PDF edition and access to all relevant documents via our trade law source document library and website.

questions the agency asked SpaceX about its proposed supplemental coverage from space service (see 2409100042). It said its design and operational strategies for orbital debris haven't changed since its previously submitted orbital debris mitigation plan. Moreover, SpaceX said it will ensure its operations won't hurt those of crewed space stations because it will avoid ongoing, nominal operations between altitudes of 385 km and 430 km. SpaceX said it can comply with the agency's OOBE limits only by suppressing its satellites' in-band transit power "and by extension the coverage, throughput, and reliability of supplemental coverage for American people." It said the limits "'will also needlessly delay deployment of realtime emergency communications -- including 911 calling" and necessitate deployment of more capacity to make up for the throughput and coverage limits. The OOBE limits are "nearly ten times more restrictive than necessary for operations in the PCS G Block," SpaceX said, noting it has deployed more than 190 D2D satellites.