Trade Law Daily is a Warren News publication.

'Staggering' Backlog Points to Sunnier Times for In-Flight Connectivity, NSR Says

After a bearish 2018 for the in-flight connectivity market -- with such metrics as contracts signed, installation rates and aircraft outfitted falling short of expectations -- 2019 could be more bullish, blogged Northern Sky Research's Claude Rousseau Sunday. Some challenges…

Sign up for a free preview to unlock the rest of this article

Timely, relevant coverage of court proceedings and agency rulings involving tariffs, classification, valuation, origin and antidumping and countervailing duties. Each day, Trade Law Daily subscribers receive a daily headline email, in-depth PDF edition and access to all relevant documents via our trade law source document library and website.

remain, such as that an in-flight system can cost as much as $1 million per aircraft and the lack of flat panel electronically steered antennas, he said. But the backlog of aircraft to outfit with high-throughput satellite capacity "is staggering," with around 3,000 expected in the next two years, the analyst said.